Brock St. Closed Until End of September 2020

A portion of Brock St. W. will be closed to through-traffic, from Tuesday, May 25th through to the end of September. The closure is related to Brock Street Culvert Project construction work. The duration of the closure is weather dependent.

Construction crews will be working in the area between Bascom St. and Toronto St. to install shoring, excavate and install pre-cast culvert sections.

Pedestrians will be able to access Brock St. W. during the closure and measures will be in place to enable pedestrians to walk through the construction area safely. Traffic detour signage will assist motorists. Motorists are asked to be patient and leave extra time to travel around the construction area.

Residents are encouraged to support downtown shops and businesses during the closure. Visitors can use the parking lot at the Fire Hall on Bascom St. for visits of 3 hours or less. For parking up to 10 hours please use the lot at the rear of 12 Main St. N. The lot on Centennial Dr. remains open.